Supplier profile
THE AEROSPACE CORPORATION
Every public-sector award we hold for this supplier, across Australia and the United States, from 10 Jun 2011 to 17 Aug 2026.
Awards won
539
all time
Attributed value
$1.2bn + AUD 7.9m
as published
Buyers
12
public bodies
Active
2011–2026
first to latest award
Awards by year
Who they win from
| Buyer | Awards | Value |
|---|---|---|
| National Aeronautics and Space Administration | 471 | $823.4m |
| National Oceanic and Atmospheric Administration | 32 | $104.2m |
| Federal Aviation Administration | 14 | $3.3m |
| Department of Energy | 5 | $198.8m |
| U.S. Geological Survey | 5 | $20.3m |
| Department of State | 3 | $1.8m |
| Geoscience Australia | 3 | AUD 7.5m |
| Department of the Air Force | 2 | not attributable |
| Department of Industry, Science and Resources | 1 | AUD 343k |
| Executive Office of the President | 1 | $79k |
What they win
Awards
Showing 476–500 of 539 awards we hold
- Igf::ot::igf Task Order Nnm16aa17t Entitled, "x-Ray Polarimetry Explorer Project". See Attached Statement Of Work For Complete Description. ↗National Aeronautics and Space Administration£62kawarded 24 Aug 2016
- Igf::ot::igf Igf::ot::igf Aerospace Shall Provide Subject Matter Expertise (Sme) And Technical Input To The Project And Support Project Meetings And Technical Interchange Meetings (Tim) As Agreed To By Aerospace And The Project Manager Or His Delegate ↗National Aeronautics and Space Administration£35kawarded 12 Aug 2016
- Igf::ot::igf Provide Technical Expertise To Ames Research Center In Performing An Independent Cost Estimate Of Two Similar Design Variants Of The Resource Prospector (Rp) Surface Segment. ↗National Aeronautics and Space Administration£39kawarded 10 Aug 2016
- Igf::ot::igf " Nesc Non-Destructive Evaluation Outer Mold Line Ultrasonic Testing " - The Scope Of This Effort Is For The Contractor To Provide Assistance In The Development Of A Bond Verification Plan For The New Orion Heatshield Architecture Which Uses Individual Molded Blocks Of Ablator Material (Avcoat) Adhesively Bonded To The Carrier Structure. Major Elements Of The Bond Verification Plan Will Include 1) Process Controls; 2) Effects Of Defects; 3) Proof Testing; And 4) Non-Destructive Evaluation (Nde). ↗National Aeronautics and Space Administration£88kawarded 5 Aug 2016
- Igf::ot::igf Landsat 9 Gsrt Review Support Purpose, Objective, And Background Of Work To Be Performed: Provide Scheduling, Project/Program Management, And Multi-Discipline Engineering Support For The Landsat 9 Flight And Ground Gsrts. Support Includes Pre-Review Activities (Reviewing Documents, Technical Interchange Meetings, Executive Sessions, And Teleconferences) And Post-Review Activities [request For Action (Rfa) Disposition, Trip Report Development, Team Caucuses, Teleconferences, And Final Report Development And Review]. The Review Timeframes Contained Within The Sow Are Estimated Dates ↗National Aeronautics and Space Administration£30kawarded 1 Aug 2016
- Igf::ot::igf Astrophysics Decadal Mission Concept Study Support. The Purpose, Objective, Background Of Work To Be Performed Includes Provide Independent Guidance And Support For Large Mission Concepts To Prepare For The National Academics Astrophysics Decadal Survey 2020. Description Of Work To Be Performed Includes That The Contractor Shall Support The Science And Technology Definition Teams (Stdt) To Identify Key Science Requirements And Potential Impact On Concept Design. Risk And Cost Driver Identification - The Contractor Shall Identify Risk And Cost Drivers For Each Of The Four Stdt I ↗National Aeronautics and Space Administration£308kawarded 26 Jul 2016
- Igf::ot::igf " Commercial Crew Program (Ccp) Systems Engineering And Integration Processes Assessment " - The Scope Of This Effort Is For The Contractor To Participate As Part Of A Team Which Will Develop A Comprehensive List Of Se&i Functions, Identify Spacex Functional Leads, Obtain Process Documentation, Assess Each Function For Gaps And Issues, And Evaluate The Completeness And Maturity Of Each Process. The Nesc Team Will Compare Spacex Se&i Processes With Accepted Practices Within The Systems Engineering Technical Discipline And With Less-Than-Adequate Se&i Processes That Have Been Ident ↗National Aeronautics and Space Administration£230kawarded 13 Jul 2016
- Igf::ot::igf " Independent Analyses: Modeling And Simulation Tool Assessment And Independent Assessment And Engineering Services: Comparison Of Technology Alternatives " - The Scope Of This Effort Is For The Contractor To Perform Independent Analyses, Using Their Unique Modeling And Simulation Tools, To Independently Verify And Assess The Performance Of A Suite Of Government Owned And Developed Modeling Tools. Additionally The Contractor Will Utilize Their Tools In Assisting NASA In Analysis Of Technology Alternatives. ↗National Aeronautics and Space Administration£173kawarded 8 Jul 2016
- Igf::ot::igf In Support Of The Technology Demonstration Mission Program Office. ↗National Aeronautics and Space Administration£999kawarded 16 Jun 2016
- Igf::ot::igf Lidar Technologies For Future Earth Science Needs Assessment Is A Follow-On To Task 62 Which Ended On April 30, 2016. The Purpose Of This Task Is To Provide Additional Subject Matter Expert Support For Upcoming Briefings And Communication Of The 2016 Esto Lidar Technology Assessment Report To A Variety Of Stakeholders. The 2016 Esto Lidar Report Was One Of The Deliverables Of Task 62. The Briefings Will Be Led By The Earth Science Technology Office (Esto). The Description Of The Work To Be Performed Is As Follows: 3.1. The Contractor Shall Provide Subject Matter Expert Support I ↗National Aeronautics and Space Administration£23kawarded 8 Jun 2016
- Igf::ot::igf Facility Assessment Of The Jpl 10 Foot Space Simulator, The 25 Foot Space Simulator, The 11 Foot Optics Chamber, And The Acoustics Test Chamber For Strategic Capabilities Assets Program (Scap). The Contractor Shall Provide On/Off-Site Project And Multidisciplinary Engineering Services, Independent Testing, Contractor-On-Site Monitoring, And Independent Evaluation Of Projects And/Or Programs, Including Cost, Schedule, And Affordability Analyses, In Any Phase Of The Life-Cycle. The Contractor Shall Also Provide Leadership Or Staffing For Focused Science And Technology Studies, Ad ↗National Aeronautics and Space Administration£166kawarded 29 Apr 2016
- Igf::ot::igf The Task Order Title Is Earth Science Technology Office (Esto) Support For Sustainable Land Imaging- Technology (Slit) 2015 Proposal Review. The Purpose, Objective, And Background Of Work To Be Performed Is As Follows: The Earth Science Technology Office (Esto) Has Responsibility To Define, Implement, And Integrate Across Multiple Disciplines A Technology Development Program For The Science Mission Directorate (Smd), Earth Science Division, And (Esd). Estos Technology Activities Encompass The Areas Of Advanced Technology Development For Instruments, Components, And Information ↗National Aeronautics and Space Administration£25kawarded 30 Mar 2016
- Igf::ot::igf " Commercial Crew Program (Ccp) Verification And Validation (V&v) Integration And Mapping To Identify Gaps And Areas For Improvement " - The Scope Of This Effort Is For The Contractor To Provide Technical Expertise To The Ccp V&v Integration And Mapping Assessment Team Which Will Assist The Team In The Evaluation Of The Ccp's V&v Planning To Understand (1) Whether The Ccp-Level Planning Approach Is Adequate, (2) Whether The Two Partners' (I.e., Boeing And Spacex) V&v Planning Response Is Adequate, And (3) Determine Whether The Integration And Flow Of The V&v Implementation Between ↗National Aeronautics and Space Administration£171kawarded 1 Mar 2016
- Igf::ot::igf The Aerospace Corporation Will Provide Technical Analysis And Assessment Services To Assist In Technically Evaluating United Launch Alliance (Ula) Work On The Space Launch Systems (Sls) Interim Cryogenic Propulsions System (Icps). Specifically, Aerospace Will Provide Spacecraft/Payload Integration And Evolution (Spie) With Technical Evaluations Pertaining To The Readiness Of Ula Icps Flight Software. ↗National Aeronautics and Space Administration£2.2mawarded 8 Feb 2016
- Igf::ot::igf " Assessing Risks Of Frangible Joint Designs " - The Scope Of This Effort Is For The Contractor To (1) Reduce Engineering Uncertainty In The Mechanics Of Frangible Joint Operation By Determining The Sensitivities In The Frangible Joint Design, (2) Understand What Drivers (Factor Sensitivities) Impact Reliability So That Designs Can Be Better Evaluated In Regard To Crew Risk, And (3) Make Recommendations For Improving Robustness Of Frangible Joint Designs As Necessary. ↗National Aeronautics and Space Administration£542kawarded 4 Feb 2016
- Igf::ot::igf Microwave Technologies For Future Earth Science Needs Assessment. The Purpose Of This Task Is To Update The 2004 Working Group On Active And Passive Microwave Technologies In Advance Of The 2017 Nrc Earth Sciences Decadal Survey. This Assessment Will Be Led By The Earth Science Technology Office (Esto). The Contractor Shall Conduct A Survey Of All Current Active And Passive Microwave Technologies (Including Fri Mitigation Technologies) State-Of-The-Art And Technology Readiness Level (Trl) As They Pertain To Future Microwave Measurement And Data Handling/Distribution Needs For ↗National Aeronautics and Space Administration£298kawarded 3 Feb 2016
- Igf::ot::igf " Support For Nesc (NASA (National Aeronautics And Space Administration) Engineering And Safety Center) Commercial Crew Program (Ccp) Avionics Architecture Review " - The Scope Of This Effort Is For The Contractor To Verify The Fault Tolerance Of The Falcon And Dragon Avionics Systems Designs Against Program Requirements; Identify Critical Parts For Candidate Evaluation For A Second Assessment Activity For Parts Testing. ↗National Aeronautics and Space Administration£213kawarded 3 Feb 2016
- Igf::ot::igf " Guidance, Navigation, And Control (Gn&c) Technical Discipline Team (Tdt) Participation " - The Scope Of This Effort Is For The Contractor To Participate On The Gn&c Tdt And So Support Multiple Nesc Technical Consultations Or Investigations. ↗National Aeronautics and Space Administration£157kawarded 28 Jan 2016
- Igf::ot::igf Seets Ii Task Order Entitled "landsat 9 Spacecraft/Observatory Support." Pace/Oct Moderate Speed Mechanisms Bearing Support. This Aerospace Corporation (Aerospace) Task Is In Support Of The Development Of Landsat 9 Spacecraft / Observatory Mission. Landsat Satellites Have Continuously Acquired Multi-Spectral Images Of The Global Land Surface Since The Launch Of Landsat 1 In 1972. The Landsat Data Archive Constitutes The Longest Record Of The Land Surface As Viewed From Space. The Landsat 9 Mission Objective Is To Extend The Ability To Detect And Quantitatively Characterize Ch ↗National Aeronautics and Space Administration£108kawarded 5 Jan 2016
- Igf::ot::igf " Maintaining Mission Operations Cost Estimation Tool (Mocet), How To Measure Level Of Heritage In Complex Space Systems, And Approach To Validating Proposed Mass And Power Margin " - The Scope Of This Effort Is For The Contractor To Provide Training To Hq And Additional Areas Of The NASA Science Mission Directorate (Smd) For Technical, Management And Cost Review Of Smd Announcement Of Opportunity (Ao) Proposals, Along With Providing 1 Year Of Technical Support. The Effort Will Also Check Cost Estimate Relationships (Cers) For Consistency On Additional Missions. Finally, This Ta ↗National Aeronautics and Space Administration£1.2mawarded 10 Dec 2015
- Igf::ot::igf Specialized Engineering, Evaluation And Test Services (Seets Ii) Lidar Technologies For Future Earth Science Needs Assessment. The Purpose Of This Task Is To Update The 2006 Working Group Report On Lidar Technologies In Advance Of The 2017 Nrc Earth Sciences Decadal Survey. This Assessment Will Be Led By The Earth Science Technology Office (Esto). The Contractor Shall Conduct A Survey Of Current Laser, Optical Detection, And Information Systems Technology State-Of-The-Art And Technology Readiness Level (Trl) As They Pertain To Future Lidar Measurement And Data Handling/Distrib ↗National Aeronautics and Space Administration£325kawarded 23 Oct 2015
- Igf::ot::igf Technical Support Services To Support Smap Mishap Investigation Board (Mib) ↗National Aeronautics and Space Administration£172kawarded 7 Oct 2015
- Igf::ot::igf Pre-Aerosol, Clouds, And Ocean Ecosystems (Pace) Ocean Color Instrument (Oci) Moderate Speed Mechanisms Bearing Support. ↗National Aeronautics and Space Administration£329kawarded 30 Sept 2015
- Igf::ot::igf Task Order No. Nnd15ac41t Evaluation Of Commercialization Barriers For Suborbital Reusable And Small Satellite Launch Systems To Facilitate Evaluation Of Barriers To Commercialization Of Emerging Suborbital Reusable And Small Satellite Launch Systems, The Flight Opportunities Program (Fop)is Tasking The Aerospace Corporation To Provide Expertise And Assistance With Assessing Market And Technology Barriers To Commercialization Of Suborbital Flight Vehicles And Small Satellites Launch Systems Relevant To The Space Technology Mission Directorate (Stmd) Investment Opportunities With U ↗National Aeronautics and Space Administration£274kawarded 25 Sept 2015
- Igf::ot::igf " Nesc (NASA Engineering And Safety Center)evaluation Of The Exploration Systems Development Division (Esd) Office's Verification And Validation (V&v) Planning To Identify Gaps And Areas For Improvement " - The Scope Of This Effort Is For The Contractor To Provide Expertise To A Series Of Analyses Of V&v Adequacy And Reports That Coincide With The Three Esd Programs (Sls, Mpcv, And Gsdo) Critical Design Reviews (Cdrs) And A Final Report In Parallel With The Esd Build-To Sync (Bts) Activities, To Be Completed In The 1st Quarter Fy16. ↗National Aeronautics and Space Administration£203kawarded 24 Sept 2015
Bidding against them?
Get new tenders in their space in a daily digest, scored against your own capability — plus the full notice behind each of these awards, with the documents and contacts it published.
Start 7-day free trialHow this profile is built
Awards are collected from official public procurement notices and deduplicated so one procurement counts once. Supplier names are grouped across their published spellings: case and punctuation are ignored, and “Ltd” is treated as optional because buyers routinely leave it off. Everything else that marks a different organisation is kept — an LLP, a plc, a CIC and a Teoranta are separate businesses from a Ltd of the same name, as are a parent and a named subsidiary, and none of them are merged here. Where another entry differs from this one only by legal form or a bracketed qualifier it is listed above as possibly the same organisation — a hint for the reader, never a merge: figures are per legal entity and never combined. Value is attributed only where the notice is explicit: the supplier's own itemised amount, or the whole value where they were the sole named supplier. Awards naming several suppliers without a published split are counted and marked shared, never valued, and a framework ceiling is never treated as money any one appointed supplier won. Sterling and euro are never added together. The linked source notice is authoritative.
Company pages are for organisations. If this page profiles you as an individual — a sole trader or an individual contractor — you can ask for it to be withheld: see how.