Supplier profile
THE AEROSPACE CORPORATION
Every public-sector award we hold for this supplier, across Australia and the United States, from 10 Jun 2011 to 17 Aug 2026.
Awards won
539
all time
Attributed value
$1.2bn + AUD 7.9m
as published
Buyers
12
public bodies
Active
2011–2026
first to latest award
Awards by year
Who they win from
| Buyer | Awards | Value |
|---|---|---|
| National Aeronautics and Space Administration | 471 | $823.4m |
| National Oceanic and Atmospheric Administration | 32 | $104.2m |
| Federal Aviation Administration | 14 | $3.3m |
| Department of Energy | 5 | $198.8m |
| U.S. Geological Survey | 5 | $20.3m |
| Department of State | 3 | $1.8m |
| Geoscience Australia | 3 | AUD 7.5m |
| Department of the Air Force | 2 | not attributable |
| Department of Industry, Science and Resources | 1 | AUD 343k |
| Executive Office of the President | 1 | $79k |
What they win
Awards
Showing 526–539 of 539 awards we hold
- Igf::ot::igf Aerospace, Proposal For Systems Engineering And Cost And Schedule Analysis Support ↗National Aeronautics and Space Administration£150kawarded 6 Feb 2013
- Igf::ot::igf Aerospace Task #16, Proposal 2013-3103 Entitled "proposal For State Of The Art (Soa) And State Of Implementation (Soi) Of Cost And Schedule Analysis Engineering Support". ↗National Aeronautics and Space Administration£134kawarded 17 Jan 2013
- Service Code Igf::ot::igf Aerospace Task # 16,"state Of The Art And State Of Implementation Of Cost And Schedule Analysis Engineering Support)" ↗National Aeronautics and Space Administration£348kawarded 16 Jan 2013
- Igf::ot::igf Subsystem Flight Validation Mission To Test Cots Components And Subsystems That Will Enable New Proximity Operations And Communications Capabilities For Cubesats And Other Spacecraft. ↗National Aeronautics and Space Administration£4.2mawarded 28 Sept 2012
- Igf::ot::igf Other Functions. Engineering And Services. 2. Purpose, Objective, And Background Of Work To Be Performed: NASA's Objective Is To Obtain An Independent Assessment Of The Security Risks Inherent In The Design, Operation And Maintenance Of Space Network Ground Systems Located At The White Sands Complex (Wsc) In Las Cruces, New Mexico. These Systems Handle Sensitive But Unclassified Data For Various NASA Customers Having A Desire To Ensure Adequate Control And Protection Of Their Mission Critical Data. 3. Description Of The Work To Be Performed: Aerospace Will Perform The Follow ↗National Aeronautics and Space Administration£3.3mawarded 26 Sept 2012
- Igf::ot::igf Other Functions. Meosar/Gps I&t And O&m Support 1. Purpose, Objective, And Background Of Work To Be Performed: The Sar/Gps Payload Provides A Near-Real-Time "bent-Pipe" Repeater Function For The Detection And Location Of Compliant 406 Mhz Distress Beacons. Sar/Gps Will Be One Component Of The International Cospas-Sarsat Search And Rescue (Sar) System And Will Be A Hosted Payload On All Gps Iiib And Gps Iiic Svs. Each Sar-Equipped Gps Iiib And Gps Iiic Satellite Will Receive Alert Signals From Aircraft-Based Emergency Locator Transmitters (Elts), Maritime Emergency Position-Indi ↗National Aeronautics and Space Administration£1.0mawarded 25 Jun 2012
- Igf::ot::igf The Contractor Shall Provide Technical Expertise In Spectrum Communications Architecture Solutions, Consultation On The National Availability Of De-Conflicted Space Spectrum, And Other Spectrum Related Efforts In Support Of The National Aeronautics And Space Administration (NASA) Ames Radio Frequency (Rf) Spectrum Management Office, Networks And Operations Division, Information Technology Directorate. ↗National Aeronautics and Space Administration£910kawarded 30 Mar 2012
- Igf::ot::igf Other Functions - The Aerospace Corporation (Aerospace) Will Provide End-To-End Independent Programmatic And Technical Monitoring And Assessment Functions That (1) Cover The Full Developmental Lifecycle, (2) Provide For Identification And Assessment Of Technical, Cost And Schedule Risk, (3) Provide A Capability To Predict Risk Realization, And Project Cost /Schedule Growth Over Time, And (4) Provide Transparency To The Program Executive (Pe), Program Analyst (Pa),theme Director, And Science Mission Directorate (Smd) Associate Administrator (Aa). The Purpose Of This Effort Is To Pr ↗National Aeronautics and Space Administration£15.8mawarded 26 Mar 2012
- Tdrs Project Support: This Effort Provides For The Aerospace Corporation Support Of The Tdrs Project Office At The Goddard Space Flight Center For The Programmatic And Technical Management Of The Tdrs K Program. The Effort Will Include But Not Be Limited To The Provision Of System Engineering, Telecommunications System Engineering, And Resident Office Surveillance Support To The Project Office. Activities Include But Are Not Limited To Requirements Analyses, Design Analyses, Modeling And Simulation, Cost Analysis Support, Architectural Studies, Trade Studies, Evaluation Of Tdrs Contractor D ↗National Aeronautics and Space Administration£6.6mawarded 29 Feb 2012
- Specialized Engineering Support To Joint Polar Satellite System (Jpss) Flight Segment Restructuring Of The National Polar-Orbiting Operational Environmental Satellite System (Npoess) Has Resulted In Noaa And NASA Assuming Acquisition Responsibility For The Afternoon Orbit Of The Constellation. These Satellites, Renamed The Joint Polar Satellite System (Jpss) Flight Segment, Will Be Developed By NASA Goddard Space Flight Center (Gsfc) For Noaa. In Order To Assure The Success Of The Jpss Development, Gsfc Requires Support From Staff From The Aerospace Corporation Who Had Previously Worked On ↗National Aeronautics and Space Administration£17.3mawarded 28 Feb 2012
- To Provide Direct Support To The Space Network Ground Segment Sustainment Project - Services: The Contractor Shall Provide On/Off-Site Project And Multidisciplinary Engineering Services, Independent Testing, Contractor-On-Site Monitoring, And Independent Evaluation Of Projects And/Or Programs, Including Cost, Schedule, And Affordability Analyses, In Any Phase Of The Life-Cycle. The Contractor Shall Also Provide Leadership Or Staffing For Focused Science And Technology Studies, Advanced Systems Architecture, Systems Engineering And Independent Reviews Of All Above Activities Pursuant To Task Or ↗National Aeronautics and Space Administration£3.0mawarded 11 Jan 2012
- Award Entitled "space Network Reliability And Loading Analysis" Risk Analysis And Security Evaluation For Space Network. The National Aeronautics And Space Administration (NASA) Goddard Space Flight Center (Gsfc) Is Responsible For Project Management Of The NASA Tracking And Data Relay Satellite System (Tdrss) Including Development And Operations Of The Space Constellation Assets As Well As The Ground System Assets. This Task Assists The National Aeronautics And Space Administration (NASA) In Predicating The Future Health Of The Tdrs Satellites In Orbit, And Predicating The Ability Of The Spac ↗National Aeronautics and Space Administration£1.8mawarded 7 Nov 2011
- Independent Assessment Of Sorce Spacecraft Battery Performance Sorce Is An Earth Science Mission Launched In January 2003 With A Five Year Design Life. As Of Today, The Mission Is Fully Operational With The Exception That The Eagle- Pitcher Provided Nickel Hydrogen Battery Is Degrading. The Battery Is Made Up Of 11 Common Pressure Vessels (Cpvs) With 2 Electrochemical Cells Per Pressure Vessel. Each Of The Cpvs Falls Into One Of Three Basic Categories: Good Cells, Marginal Cells And Under-Performing Cells. Five Of The Cpvs Are Performing Very Well, Three Cpvs Fall Into The Marginal Category, A ↗National Aeronautics and Space Administration£38kawarded 16 Sept 2011
- Special Studies/Analysis- Aeronautical/Space ↗National Aeronautics and Space Administration£36.2mawarded 10 Jun 2011
Bidding against them?
Get new tenders in their space in a daily digest, scored against your own capability — plus the full notice behind each of these awards, with the documents and contacts it published.
Start 7-day free trialHow this profile is built
Awards are collected from official public procurement notices and deduplicated so one procurement counts once. Supplier names are grouped across their published spellings: case and punctuation are ignored, and “Ltd” is treated as optional because buyers routinely leave it off. Everything else that marks a different organisation is kept — an LLP, a plc, a CIC and a Teoranta are separate businesses from a Ltd of the same name, as are a parent and a named subsidiary, and none of them are merged here. Where another entry differs from this one only by legal form or a bracketed qualifier it is listed above as possibly the same organisation — a hint for the reader, never a merge: figures are per legal entity and never combined. Value is attributed only where the notice is explicit: the supplier's own itemised amount, or the whole value where they were the sole named supplier. Awards naming several suppliers without a published split are counted and marked shared, never valued, and a framework ceiling is never treated as money any one appointed supplier won. Sterling and euro are never added together. The linked source notice is authoritative.
Company pages are for organisations. If this page profiles you as an individual — a sole trader or an individual contractor — you can ask for it to be withheld: see how.