Supplier profile
THE AEROSPACE CORPORATION
Every public-sector award we hold for this supplier, across Australia and the United States, from 10 Jun 2011 to 17 Aug 2026.
Awards won
539
all time
Attributed value
$1.2bn + AUD 7.9m
as published
Buyers
12
public bodies
Active
2011–2026
first to latest award
Awards by year
Who they win from
| Buyer | Awards | Value |
|---|---|---|
| National Aeronautics and Space Administration | 471 | $823.4m |
| National Oceanic and Atmospheric Administration | 32 | $104.2m |
| Federal Aviation Administration | 14 | $3.3m |
| Department of Energy | 5 | $198.8m |
| U.S. Geological Survey | 5 | $20.3m |
| Department of State | 3 | $1.8m |
| Geoscience Australia | 3 | AUD 7.5m |
| Department of the Air Force | 2 | not attributable |
| Department of Industry, Science and Resources | 1 | AUD 343k |
| Executive Office of the President | 1 | $79k |
What they win
Awards
Showing 501–525 of 539 awards we hold
- Igf::ot::igf "nasa Space Launch Systems" ↗National Aeronautics and Space Administration£501kawarded 27 Aug 2015
- Igf::ot::igf Support And Analysis For Earth Venture-Mission, Spacecraft Reliability Assessment ↗National Aeronautics and Space Administration£85kawarded 24 Aug 2015
- Igf::ot::igf Jpss Program System Engineering (Pse) Support. This Task Provides Experienced, Specialized System Engineering Support To The Jpss Program 1. Develop Single Jpss Data Product Specification Integrating Level 1 Supplement, Gsrd Vol 2, Jerd Volume 2 Into A Single Jpss Data Product Specification As Part Of Technical Baseline For The Multi-Mission System (Mms) Review Scheduled For Winter 2015. Collaborate With Jpss Science, Jpss Pse Team And With Algorithm Management Team To Develop Specification 2. Support Jpss Pse Team, Project Science Team And Algorithm Management Project In System E ↗National Aeronautics and Space Administration£1.4mawarded 1 Jul 2015
- Igf::ot::igf " Nesc (NASA Engineering And Safety Center) Molded Avcoat Block Bond Verification " - The Scope Of This Effort Is For The Contractor To Provide Assistance In The Development Of A Bond Verification Plan For The New Orion Heatshield Architecture Which Uses Individual Molded Blocks Of Ablator Material (Avcoat) Adhesively Bonded To The Carrier Structure. Major Elements Of The Bond Verification Plan Will Include 1) Process Controls; 2) Effects Of Defects; 3) Proof Testing; And 4) Non-Destructive Evaluation (Nde). ↗National Aeronautics and Space Administration£590kawarded 8 Jun 2015
- Igf::ot::igf " Technology Development Program Health And Performance Metrics Phase Ii " - The Scope Of This Effort Is For The Contractor To Develop A Further Understanding Of Science And Technology Developer Organizations Best Practices In Areas Like The Number Of Personnel, Organizational Structure, Work And Other Relevant Factors And Then Make Recommendations On Best Practices For The Game Changing Development Office (A3) To Consider Adopting. ↗National Aeronautics and Space Administration£211kawarded 7 May 2015
- Igf::ot::igf Aerospace, Support To The Lightning Imaging Support (Lis) Project Office ↗National Aeronautics and Space Administration£79kawarded 13 Apr 2015
- Igf::ot::igf " Loads And Dynamics Technical Discipline Team (Tdt) Participation " - The Scope Of This Effort Is For The Contractor To Participate On The Loads And Dynamics (L&d) Tdt And On Multiple Nesc Technical Consultations Or Investigations Related To L&d. ↗National Aeronautics and Space Administration£191kawarded 24 Feb 2015
- Igf::ot::igf " Member Of The NASA Engineering And Safety Center Systems Engineering Technical Discipline Team " - The Scope Of This Effort Is For The Contractor To Support Nesc Approved Activities And Implementing Best Practices In Systems Engineering Throughout NASA As A Member Of The Technical Discipline Team (Tdt). ↗National Aeronautics and Space Administration£164kawarded 23 Dec 2014
- Igf::ot::igf "nesc (NASA (National Aeronautics And Space Administration) Engineering And Safety Center) Technical Assessment - Mpcv (Multi-Purpose Crew Vehichle) Avcoat Study " - The Scope Of This Effort Is For The Contractor To Provide Technical Support In Several Areas Associated With The Orion Heat Shield For The Eft-1 And Future Missions. The Aerospace Corporation Will Provide Statistical Experimental Design And Data Analysis And Other Support In This Technical Area As A Member Of The Avcoat Study Team. ↗National Aeronautics and Space Administration£270kawarded 29 Oct 2014
- Igf::ot::igf "osiris-Rex Flight Dynamics Team Navigation Expert Support": The Origins Spectral Interpretation Resource Identification Security-Regolith Explorer (Osiris- Rex) Mission S Primary Goal Is An Earth Return Of Regolith Sample From A Type-B Near Earth Object (Neo) Asteroid. The Osiris-Rex Mission Will Gather This Sample Through A Flight System Consisting Of A Science Instrument Suite, A Touch-And-Go Sample Acquisition Mechanism (Tagsam), And A Sample Return Capsule (Src). The Flight System Will Rendezvous With The Neo, Observe, Characterize And Map The Asteroid, And Finally Approach, ↗National Aeronautics and Space Administration£1.6mawarded 23 Oct 2014
- Igf::ot::igf This Requirement Is For Continued/Follow-On Organizational Support And Assistance To Scap Program Managers In Setting Up And Making Functional The Space Environment Test Assets Group (Setag), Identify And Understand The Capability Portfolio Contents Within And Outside The Agency, And Perform Independent Asset Condition Assessments In Order To Assist Scap Program To Monitor Health And Safety Of Its Program Assets. Support Shall Include, But Not Limited To, Working With The Specified Portfolio Groups, Setting Up And Facilitating Meetings, Drafting And Finalizing And Presenting Studi ↗National Aeronautics and Space Administration£881kawarded 30 Sept 2014
- Igf::ot::igf Seets Ii Contract - Entitled: "geostationary Operational Environmental Satellite (Goes) - Nop Anomaly Investigations". These Activities Include, But Are Not Limited To, Specialized Discipline Engineering Expertise Experienced In The Design And Operations Of Specific Subsystems And/Or Assemblies. Agency Wide Aerospace Procurement. The Contractor Shall Provide On/Off-Site Project And Multidisciplinary Engineering Services, Independent Testing, Contractor-On-Site Monitoring, And Independent Evaluation Of Projects And/Or Programs, Including Cost, Schedule, And Affordability Analys ↗National Aeronautics and Space Administration£45kawarded 12 Sept 2014
- Igf::ot::igf Earth Science Mission Operations (Esmo) Mission Director Support. This Task Is In Support Of The Applied Engineering And Technology Directorate (Aetd), Software Engineering Division (Sed), Mission Validation And Operations Branch. The Support Will Be A Full-Time Contractor Employee To Serve As Mission Director Support For The Esmo Project. The Esmo Project Manager Will Provide Day-To-Day Direction And The Contractor Will Be On-Site Located In Esmo Project Office. The Contractor Will Work Under The Authority Of The Lead Mission Director, Located In The Mission Validation And Oper ↗National Aeronautics and Space Administration£954kawarded 5 Aug 2014
- Igf::ot::igf Engineering Support Services: Jpss Space Asset Program (Sapp) Support. The Space Asset Protection Program Has Many Engineering Work Items That Need To Be Finished In A Relatively Short Period Of Time And Require Protection Expertise To Accomplish Them Quickly. The Purpose Of This Task Is To Tap Into The Aerospace Corporation S Protection Expertise In Order To Enable The Rapid Completion Of Some Of These Items. The Contractor Shall Assist The Government In Developing And Implementing Procedures For Anomaly Detection, Characterization And Reporting. The Contractor Shall Use The US G ↗National Aeronautics and Space Administration£1.5mawarded 8 Jul 2014
- Igf::ot::igf Integrated Solar Array And Reflectarray Antenna (Isara) ↗National Aeronautics and Space Administration£2.2mawarded 4 Jun 2014
- Igf::ot::igf Jpss Space Asset Protection Program (Sapp) Support. The Contractor Will Provide System Engineering Support. Review And Perform Analysis To Inform Architecture Design Decisions. Conduct Analysis Of The Mission. Implement Threat Detection And Mitigation Options And Advise The Sapp And Jpss-2 Personnel. Identify And Document Lessons Learned From The Beginning To The End Of The Task. Provide Personnel Capable Of Reviewing And Assessing Material. Consult With Sapp To Ensure That Products Are Appropriately Classified. The Joint Polar Satellite System-2 (Jpss-2) Mission Is Jointl ↗National Aeronautics and Space Administration£5.2mawarded 18 Feb 2014
- Igf::ot::igf Specialized Engineering, Evaluation And Test Services (Seets Ii) Contract. Title: Explorers Heliophysics Srb Support To Icon And Gold Projects. Contractor Will Provide Scheduling, Project/Program Management, And Multi-Discipline Engineering Support For The Explorers Heliophysics Program Reviews For Icon And Gold. Support Includes Pre-Review Activities (Reviewing Documents, Technical Interchange Meetings, Executive Sessions, And Teleconferences) And Post-Review Activities Disposition, Trip Report Development, Team Caucuses, Teleconferences, And Final Report Development And Revi ↗National Aeronautics and Space Administration£196kawarded 7 Jan 2014
- Igf::ot::igf The Contractor Shall Provide On/Off-Site Project And Multidisciplinary Engineering Services, Independent Testing, Contractor-On-Site Monitoring, And Independent Evaluation Of Projects And/Or Programs, Including Cost, Schedule, And Affordability Analyses, In Any Phase Of The Life-Cycle. The Contractor Shall Also Provide Leadership Or Staffing For Focused Science And Technology Studies, Advanced Systems Architecture, Systems Engineering And Independent Reviews Of All Above Activities Pursuant To Task Orders Issued By The Contracting Officer. These Services Shall Include The Personne ↗National Aeronautics and Space Administration£48kawarded 13 Nov 2013
- Igf::ot::igf Earth Science Technology Office (Esto) Support. Specialized Engineering, Evaluation And Test Services (Seets Ii) The Earth Science Technology Office (Esto) Has Responsibility To Define, Implement, And Integrate Across Multiple Disciplines A Technology-Development Program For The Science Mission Directorate (Smd), Earth Science Division, (Esd). Esto S Technology Activities Encompass The Areas Of Advanced Technology Development For Instruments, Components, And Information Systems. These Thrust Areas Require State-Of-The-Art Expertise In Disciplines Such As Detectors, Components, Dat ↗National Aeronautics and Space Administration£823kawarded 28 Oct 2013
- Igf::cl::igf Aerospace Ffrdc Contract From 1 Oct 2013 To 30 Sept 2018 ↗Department of the Air Forceawarded 1 Oct 2013
- Igf::ot::igf Funds For Aerospace Support To Jpss Mission 1 (J1) Visible Infrared Imaging Radiometer Suite (Viirs) Test Program. This Task Provides Experienced, Specialized Support To The Jpss Program. The Task Provides Independent Analysis Of The Viirs Flight Model (Fm)-2 Performance Tests, Providing The Jpss Flight Project With The Assurance That Viirs Fm-2 Instrument Meets Its Performance Requirements. The Contractor Shall Perform Requested Test Data Analysis On The Planned J1 Viirs System Level Performance Tests. The Contractor Will Analysis Activities Include Comparisons With Re ↗National Aeronautics and Space Administration£2.1mawarded 17 Sept 2013
- Igf::ot::igf The Aerospace Corporation Shall Provide Support To Iss Life Science Payloads In The Areas Of Materials And Processes, Contamination Control, Integration And Test Planning, System Engineering, Safety Planning, Engineering Analysis, Technical Insight, And Technology Review. ↗National Aeronautics and Space Administration£384kawarded 19 Aug 2013
- Igf::ot::igf Other Functions Award Of Task Order No. Dtrtv-T3009 ↗Immediate Office of the Secretary of Transportation£40kawarded 31 Jul 2013
- Igf::ot::igf Funds For Jpss-Ground Data Products Engineer Support. Acquisition Of Specialized Engineering, Evaluation And Test Services For The NASA Jpss Data Products Groups Related To The Development And Verification Of Jpss Cgs Operational Algorithms Under Dpa And Dpe. The Contractor Shall Provide Engineering Subject Matter Expertise And Project Monitoring Communication And Coordination Both Within The Jpss Project And With External Providers To Assure Correct Production Of Jpss Ground Interface Data Processing Segment (Idps) And Field Terminal Segment (Fts) Operational Data Products In Su ↗National Aeronautics and Space Administration£2.4mawarded 26 Jul 2013
- Igf::ot::igf Studies And Analysis Of Goddard Space Flight Center (Gsfc)projects. The Center Director And The Deputy Director For Science, Operations And Program Performance At The NASA Goddard Space Flight Center (Gsfc) Are Responsible For Managing The Center S Diverse And Complex Research And Development Portfolio; Formulating The Center S Future Science And Technology Goals; And Leading An Integrated Program Of Investments And Initiatives Aligned To Meet Those Goals. Accordingly, The Contractor Shall Provide Qualified Technical Expertise To Goddard Center Management To Conduct Assessments Of ↗National Aeronautics and Space Administration£2.2mawarded 19 Feb 2013
Bidding against them?
Get new tenders in their space in a daily digest, scored against your own capability — plus the full notice behind each of these awards, with the documents and contacts it published.
Start 7-day free trialHow this profile is built
Awards are collected from official public procurement notices and deduplicated so one procurement counts once. Supplier names are grouped across their published spellings: case and punctuation are ignored, and “Ltd” is treated as optional because buyers routinely leave it off. Everything else that marks a different organisation is kept — an LLP, a plc, a CIC and a Teoranta are separate businesses from a Ltd of the same name, as are a parent and a named subsidiary, and none of them are merged here. Where another entry differs from this one only by legal form or a bracketed qualifier it is listed above as possibly the same organisation — a hint for the reader, never a merge: figures are per legal entity and never combined. Value is attributed only where the notice is explicit: the supplier's own itemised amount, or the whole value where they were the sole named supplier. Awards naming several suppliers without a published split are counted and marked shared, never valued, and a framework ceiling is never treated as money any one appointed supplier won. Sterling and euro are never added together. The linked source notice is authoritative.
Company pages are for organisations. If this page profiles you as an individual — a sole trader or an individual contractor — you can ask for it to be withheld: see how.