Supplier profile
GREAT WEST ENGINEERING INC
Every public-sector award we hold for this supplier, across the United States, from 9 Sept 2019 to 24 Sept 2026.
Awards won
145
all time
Attributed value
$21.3m
as published
Buyers
4
public bodies
Active
2019–2026
first to latest award
Awards by year
Who they win from
| Buyer | Awards | Value |
|---|---|---|
| Forest Service | 115 | $15.0m |
| National Park Service | 27 | $5.6m |
| Under Secretary for Farm and Foreign Agricultural Services | 2 | $392k |
| NATIONAL OPERATIONS CENTER | 1 | $261k |
What they win
Awards
Showing 101–125 of 145 awards we hold
- Gaoa Trailhead Road Access Survey And Design, Nez Perce-Clearwater National Forests. 1. Your Price Proposal Dated 8/3/2022 Is Hereby Accepted. 2. Work Shall Be Completed In Accordance With The Attached Statement Of Work And Price Proposal. 3. Al ↗Forest Service£223kawarded 22 Aug 2022
- Contractor Shall Provide Construction Inspection Services For The, North Fork Ranger District, Nez Perce-Clearwater National Forests. Terms And Conditions From Idiq Award 12034320d0038 Apply To This Order. The Cor For This Task Is Katy.bilisol@usda.g ↗Forest Service£53kawarded 12 Aug 2022
- A/E Services For Dam Assessment For Chat ↗National Park Service£100kawarded 9 Aug 2022
- Gaoa Repair Three (3) Historic Routes / Associated Rec Sites, Nez Perce-Clearwater National Forests. ↗Forest Service£108kawarded 8 Aug 2022
- Phase 2 Horse Creek Survey And Design. Task Order On Regional Idiq Contract 12034320d0038 ↗Forest Service£30kawarded 19 Jul 2022
- Typical Projects May Require Design, Field Inspection, Surveying, Load Rating, Or Engineering Review For: Large & Small Road Bridges, Trail Bridges, Aquatic Organism Passage (Aop) Structures & Associated Stream Work, Culverts, Bottomless Arch ↗Forest Service£123kawarded 22 Jun 2022
- Ae Design Task Order For Road 17507 Slide Stabilization Survey And Design ↗Forest Service£46kawarded 21 Jun 2022
- Gaoa Falls Creek Campground Summit Trailhead Survey & Design ↗Forest Service£83kawarded 8 Jun 2022
- Survey And Design Of Cabin Gulch And Beartrap Creek Culverts. ↗Forest Service£42kawarded 3 Jun 2022
- Prepare Preliminary And Final Design, Special Project Specifications, Drawings And Cost Estimates For The Replacement Of The Upper Graves Creek Crossing With An Appropriate Permanent Structure ↗Forest Service£35kawarded 1 Jun 2022
- Npc Fw Historic Routes Deferred Maintenance Site Visit 1. Your Price Proposal Dated 5/9/2022 Is Hereby Accepted. 2. Work Shall Be Completed In Accordance With The Attached Statement Of Work And Price Proposal. 3. All Terms And Conditions O ↗Forest Service£42kawarded 20 May 2022
- Architect And Engineering Services To Complete The Construction Documents For The Rehabilitation Of The Indian Creek Trail Access. ↗National Park Service£134kawarded 16 May 2022
- The Superior Ranger District Is Planning For The Site Utility Planning, Design, And Contract Preparation For Significant Modifications To The Historic Savenac Tree Nursery Utility Systems. ↗Forest Service£49kawarded 13 May 2022
- Gaoa Selway Trail Bridge Designs - Provide Preliminary Survey, Design And Final Design For A Fs Trail Crew To Rehabilitate Two Existing Suspension Trail Bridges On The Nez Perce-Clearwater National Forests. ↗Forest Service£70kawarded 28 Apr 2022
- Field & Office Project Support For Region 1. The Details Of Each Request Will Vary But Generally The Scope And Size Shall Be For Minor Engineering Related Services Incidental To Forest Service Operations. Requests May Be For, But Are Not Li ↗Forest Service£20kawarded 16 Feb 2022
- Pattee Pavilion Site Visit, Preliminary And Final Design For The Regional Office In Missoula, Mt. ↗Forest Service£17kawarded 7 Dec 2021
- Gaoa Trailhead Road Access Site Visits On The Nez Perce-Clearwater National Forest ↗Forest Service£48kawarded 15 Nov 2021
- Lolo Selway Designs, Lochsa And Powell Rd's, Nez Perce-Clearwater National Forests. ↗Forest Service£129kawarded 22 Oct 2021
- Gaoa Lolo Civil A&e Mission Support Services - Great West ↗Forest Service£32kawarded 19 Oct 2021
- Big Boulder Final Design, Salmon River Ranger District, Npcnf. ↗Forest Service£20kawarded 18 Oct 2021
- Kamiah-Pierce Road 100-Pavement Preservation Project Design. Chip Seal, Crack Seal, Road Striping, Drainage, And Subgrade Improvements Design. ↗Forest Service£46kawarded 30 Sept 2021
- Prepare An Alternatives Analysis And Final Design, Plans, Specifications, Calculations, Cost Estimates, Forest Service Supplemental Specifications, For 2 Aquatic Organism Passage (Aop) Sites On The Malheur National Forest. ↗Forest Service£226kawarded 29 Sept 2021
- Break Water Bridge Rehab Design ↗Forest Service£40kawarded 24 Sept 2021
- Region One (1) 2021 Bridge Load Rating ↗Forest Service£98kawarded 24 Sept 2021
- A/E Wa - Drainage Assessment On Three (3) Nrcs Easements - Snohomish County, Washington National Ae Matoc 2021-10 ↗Under Secretary for Farm and Foreign Agricultural Services£125kawarded 23 Sept 2021
Bidding against them?
Get new tenders in their space in a daily digest, scored against your own capability — plus the full notice behind each of these awards, with the documents and contacts it published.
Start 7-day free trialHow this profile is built
Awards are collected from official public procurement notices and deduplicated so one procurement counts once. Supplier names are grouped across their published spellings: case and punctuation are ignored, and “Ltd” is treated as optional because buyers routinely leave it off. Everything else that marks a different organisation is kept — an LLP, a plc, a CIC and a Teoranta are separate businesses from a Ltd of the same name, as are a parent and a named subsidiary, and none of them are merged here. Where another entry differs from this one only by legal form or a bracketed qualifier it is listed above as possibly the same organisation — a hint for the reader, never a merge: figures are per legal entity and never combined. Value is attributed only where the notice is explicit: the supplier's own itemised amount, or the whole value where they were the sole named supplier. Awards naming several suppliers without a published split are counted and marked shared, never valued, and a framework ceiling is never treated as money any one appointed supplier won. Sterling and euro are never added together. The linked source notice is authoritative.
Company pages are for organisations. If this page profiles you as an individual — a sole trader or an individual contractor — you can ask for it to be withheld: see how.