Supplier profile
GREAT WEST ENGINEERING INC
Every public-sector award we hold for this supplier, across the United States, from 9 Sept 2019 to 24 Sept 2026.
Awards won
145
all time
Attributed value
$21.3m
as published
Buyers
4
public bodies
Active
2019–2026
first to latest award
Awards by year
Who they win from
| Buyer | Awards | Value |
|---|---|---|
| Forest Service | 115 | $15.0m |
| National Park Service | 27 | $5.6m |
| Under Secretary for Farm and Foreign Agricultural Services | 2 | $392k |
| NATIONAL OPERATIONS CENTER | 1 | $261k |
What they win
Awards
Showing 126–145 of 145 awards we hold
- Gaoa Multnomah Falls Lodge Design Upgrades ↗Forest Service£1.4mawarded 13 Sept 2021
- Design The Replacements Of 5 Road Bridges On The Beaverhead-Deerlodge Nf, With A Possible Addition Of 3 Road Bridge Designs If Funding Becomes Available. ↗Forest Service£286kawarded 19 Aug 2021
- Conduct Project Site Survey, Prepare Preliminary And Final Design To Include Applicable Contract Documents: Sow, Schedule B And C, Special Project Specifications, Drawings And Estimates For The Following Project. ↗Forest Service£38kawarded 17 Aug 2021
- The Procurement Is To Solicit A&e Firms For A Design To Replace Barlow Creek Bridge, On The Mt Hood National Forest. The Design Will Provide Construction Documents (Drawings, Specifications, Schedule Of Items, Construction Estimate, Ect.) In Addi ↗Forest Service£93kawarded 21 Jul 2021
- Castle Creek Culvert Replacement Site Visit And Preliminary Meeting, Salmon River Ranger District, Nez Perce-Clearwater National Forests. ↗Forest Service£157kawarded 14 Jul 2021
- Conduct Project Site Surveys, Prepare Preliminary And Final Designs To Include Applicable Contract Documents: Sow, Schedule B And C, Special Project Specifications, Drawings And Estimates For The Following List Of Project Sites: Castles Access Aop, ↗Forest Service£182kawarded 13 Jul 2021
- 2021 Construction Inspection Services2, Nezperce Clearwater Nf ↗Forest Service£66kawarded 8 Jul 2021
- The Two Culverts That Are Proposed To Be Surveyed And Designed Are Along Canyon Creek And West Fork Johnson Creek, Located On The Sandpoint Ranger District. These Two Culverts Will Be In Associated With Stewardship, Called Granite Stew. ↗Forest Service£50kawarded 24 Jun 2021
- 2021 Construction Inspections Services Nezperce Clearwater Nf ↗Forest Service£32kawarded 17 Jun 2021
- Gaoa Beaverhead Deerlodge Access Road Survey And Design Includes The Following Gaoa Projects: Gaoa Mt B-D: Delmoe Lake Road Resurfacing And Cg/Day Use Updates (1bz) Gaoa Mt B-D: E Fork 672 Highlnd 84 Centennial Dvd 100 Roads Design (1aw) Gaoa Mt B ↗Forest Service£128kawarded 3 Jun 2021
- Design Aop Culvert On Flood Creek ↗Forest Service£77kawarded 2 Jun 2021
- A&e Contract For Road Locations On The West Zone Of The Lolo Nf ↗Forest Service£65kawarded 20 May 2021
- A/E Fracture Critical Bridge Inspections Is Awarded In Accordance With The Region 1 Structural, Civil, Water & Wastewater Inspection And Design (Scwwid) Master Idiq Award And The Attached Terms And Conditions. ↗Forest Service£101kawarded 3 May 2021
- R1 A/E Idiq Construction Support Gw ↗Forest Service£12kawarded 29 Mar 2021
- Lower Harvey Creek Geomorphic Assessment And Restoration Alternatives Analysis&designs ↗Forest Service£140kawarded 2 Sept 2020
- R6 Ap#535812 - Fsr16 Big Creek Crossing Design Project ↗Forest Service£94kawarded 28 May 2020
- Fsr16 Repave Design Task Order ↗Forest Service£117kawarded 19 May 2020
- Engineering Technical/Construction Support Task Order ↗Forest Service£11kawarded 11 Mar 2020
- 12spec18d0021 / 129jgp19f0118 - Olive Lake Dam Tabletop Exercise ↗Forest Service£36kawarded 15 Sept 2019
- Callahan Culvert Replacement A&e Design, Tiller Ranger District, Umpqua National Forest Provide Professional Architect-Engineering Services For Designing A Replacement For A Failing 60-Inch Culvert On Callan Creek, Designed To Hand Q100 Floods, ↗Forest Service£20kawarded 9 Sept 2019
Bidding against them?
Get new tenders in their space in a daily digest, scored against your own capability — plus the full notice behind each of these awards, with the documents and contacts it published.
Start 7-day free trialHow this profile is built
Awards are collected from official public procurement notices and deduplicated so one procurement counts once. Supplier names are grouped across their published spellings: case and punctuation are ignored, and “Ltd” is treated as optional because buyers routinely leave it off. Everything else that marks a different organisation is kept — an LLP, a plc, a CIC and a Teoranta are separate businesses from a Ltd of the same name, as are a parent and a named subsidiary, and none of them are merged here. Where another entry differs from this one only by legal form or a bracketed qualifier it is listed above as possibly the same organisation — a hint for the reader, never a merge: figures are per legal entity and never combined. Value is attributed only where the notice is explicit: the supplier's own itemised amount, or the whole value where they were the sole named supplier. Awards naming several suppliers without a published split are counted and marked shared, never valued, and a framework ceiling is never treated as money any one appointed supplier won. Sterling and euro are never added together. The linked source notice is authoritative.
Company pages are for organisations. If this page profiles you as an individual — a sole trader or an individual contractor — you can ask for it to be withheld: see how.