Supplier profile
KOVILIC CONSTRUCTION CO INC
Every public-sector award we hold for this supplier, across the United States, from 3 May 2019 to 30 Sept 2026.
Awards won
37
all time
Attributed value
$106.4m
as published
Buyers
7
public bodies
Active
2019–2026
first to latest award
Awards by year
Who they win from
| Buyer | Awards | Value |
|---|---|---|
| Federal Highway Administration | 18 | $51.5m |
| Department of the Army | 9 | $12.7m |
| U.S. Fish and Wildlife Service | 5 | $6.6m |
| 693C73 EASTERN FED LANDS DIVISION | 2 | $21.3m |
| Forest Service | 1 | $2.8m |
| National Park Service | 1 | $11.1m |
| W7NN USPFO ACTIVITY NHANG 157 | 1 | $487k |
What they win
Awards
Showing 1–25 of 37 awards we hold
- Repair Taxiway Shoulders ↗W7NN USPFO ACTIVITY NHANG 157£487kawarded 30 Sept 2026
- Construct New Water Control Structure (Harrison Lake Nfh) ↗U.S. Fish and Wildlife Service£295kawarded 30 Jun 2026
- Huntington Ravine Wat Bridges Replacement ↗Forest Service£2.8mawarded 2 Mar 2026
- Project VA Erfo Fs Gwjef808 2020-2(2) The Project Consists Of Finalizing The Design For Replacing Lick Creek Trail Bridge And Construction Of A Temporary Access Trail, Temporary Helicopter Landing Pad, Trail Bridge Replacement, And Other Miscellaneo ↗Federal Highway Administration£1.6mawarded 24 Oct 2025
- Project Md Np Bawa 1(12), 2(12) The Project Consists Of The Repair And Rehabilitation Of Structures No. 3530-003p, 3530-004p, And 3530-021p Within The Baltimore-Washington Parkway. The Work Includes Deck Repair, Capstone, Joints Repairs, Railing Rep ↗Federal Highway Administration£3.8mawarded 22 Sept 2025
- Snake Creek Gatewell Covers, Garrison Dam ↗Department of the Army£215kawarded 26 Aug 2025
- Frl Machinery Platform Concrete Rehabilitation ↗Department of the Army£905kawarded 18 Jun 2025
- Garrison Project Spillway Bridge Concrete Repairs ↗Department of the Army£727kawarded 6 Dec 2024
- Wv Np Neri 107(2) The Project Consists Of Granular Backfill, Mse Wall Construction, Deep Geotechnical Patches, Pipe Culverts, Inlets, Manholes, Curb And Gutter, Asphalt Paved Waterway, And Guardrail Replacement. The Work Includes Roadway Excavation, ↗Federal Highway Administration£10.2mawarded 28 Aug 2024
- New River Gorge National Park & Preserve ↗693C73 EASTERN FED LANDS DIVISION£10.2mawarded 28 Aug 2024
- Co ~ Rocky Mountain Arsenal National Wildlife Refuge (Nwr) ~ Low Water Culvert Your Company Was Selected To Provide Construction Services At The Rocky Mountain Arsenal (Rma) National Wildlife Refuge (Nwr), 6550 Gateway Road, Commerce City, Co 8002 ↗U.S. Fish and Wildlife Service£532kawarded 18 Jun 2024
- Nd Flap 704(1) And 795(1) Magpie &whitetail Crossings ↗Federal Highway Administration£4.6mawarded 26 Dec 2023
- Project Md Erfo Nps Choh 2019-1(1): The Project Consists Of Embankment Slope Repair With Riprap Slope And Rockery Wall Construction, Pavement Patching, Guardrail, Shoulder Repairs, Drainage Replacement, And Other Miscellaneous Work. The Work Include ↗Federal Highway Administration£1.3mawarded 8 Dec 2023
- Blue Ridge Parkway ↗693C73 EASTERN FED LANDS DIVISION£11.0mawarded 31 Aug 2023
- Project Nc Np Blri 2a16 The Project Consists Of The Rehabilitation Of Big Pine Creek Bridge #6, Big Pine Creek Bridge #3, And Brush Creek Bridge #1 Between Mm 223.00 And Mm 228.00. The Work Includes Rehabilitation Of The Substructure And Superstruc ↗Federal Highway Administration£13.6mawarded 31 Aug 2023
- Project Dc Erfo Nps Choh 2019-1(1) The Project Consists Of Asphalt Concrete Pavement Resurfacing; Gravel Overlay; Bridge Scour Repair; Culvert Replacement And Removal; Riprap; Minor Reinforced Concrete Pavement Patching; Temporary Diversion Berm; Fi ↗Federal Highway Administration£550kawarded 17 Aug 2023
- Project Np Blri 1g28, 1n19 The Project Consists Of Performing Maintenance Repairs On Two Bridges On The Blue Ridge Parkway. The Work Includes The Replacement Of Bridge Bearings, And Other Miscellaneous Work. ↗Federal Highway Administration£948kawarded 30 Nov 2022
- Gaoa Choh 241449 Restore Canal Prism And Stabilize Historic Dry Laid Stone Wall ↗National Park Service£11.1mawarded 15 Nov 2022
- East Lynn Bridge Bearing Replacement ↗Department of the Army£358kawarded 25 Sept 2022
- Jwf Spllway Bridge Rehabilitation, Haysi, VA ↗Department of the Army£3.4mawarded 22 Sept 2022
- Nd - Valley City Wetland Management District-Rehab Tomahawk Dam ↗U.S. Fish and Wildlife Service£1.5mawarded 20 Sept 2022
- Nd Flap 136(1) & 145(1) Tewaukon Structures ↗Federal Highway Administration£1.2mawarded 14 Jun 2022
- Mt Fs Erfo 2018(1)-73(1), Helena-Lewis & Clark 2018 Repairs, Phase 1 Includes Earthwork, Subgrade And Road Base Construction, Slope Construction, Bituminous Surface Treatment, And Drainage Infrastructure In The Lewis And Clark National Forest ↗Federal Highway Administration£539kawarded 17 May 2022
- Project Np-Nace Trl(1): The Project Consists Of The Installation Of Mile Marker And Pavement Marking Signs On The Anacostia River Trail. ↗Federal Highway Administration£146kawarded 4 Apr 2022
- Sd Ftbl Bcb(1) Horse Soldier Road To Fort Meade ↗Federal Highway Administration£3.5mawarded 2 Mar 2022
Bidding against them?
Get new tenders in their space in a daily digest, scored against your own capability — plus the full notice behind each of these awards, with the documents and contacts it published.
Start 7-day free trialHow this profile is built
Awards are collected from official public procurement notices and deduplicated so one procurement counts once. Supplier names are grouped across their published spellings: case and punctuation are ignored, and “Ltd” is treated as optional because buyers routinely leave it off. Everything else that marks a different organisation is kept — an LLP, a plc, a CIC and a Teoranta are separate businesses from a Ltd of the same name, as are a parent and a named subsidiary, and none of them are merged here. Where another entry differs from this one only by legal form or a bracketed qualifier it is listed above as possibly the same organisation — a hint for the reader, never a merge: figures are per legal entity and never combined. Value is attributed only where the notice is explicit: the supplier's own itemised amount, or the whole value where they were the sole named supplier. Awards naming several suppliers without a published split are counted and marked shared, never valued, and a framework ceiling is never treated as money any one appointed supplier won. Sterling and euro are never added together. The linked source notice is authoritative.
Company pages are for organisations. If this page profiles you as an individual — a sole trader or an individual contractor — you can ask for it to be withheld: see how.