Supplier profile
TRANSPORTATION TECHNOLOGY CENTER, INC.
Every public-sector award we hold for this supplier, across Canada and the United States, from 8 Aug 2013 to 19 Aug 2026.
Awards won
89
all time
Attributed value
$67.4m + CAD 381k
as published
Buyers
7
public bodies
Active
2013–2026
first to latest award
Awards by year
Who they win from
| Buyer | Awards | Value |
|---|---|---|
| Federal Railroad Administration | 76 | $47.6m |
| Immediate Office of the Secretary of Transportation | 5 | $136k |
| Public Works and Government Services Canada | 3 | CAD 381k |
| Transportation Security Administration | 2 | $4.1m |
| Department of Energy | 1 | $15.4m |
| Department of Public Works and Government Services (PSPC) | 1 | not attributable |
| Pipeline and Hazardous Materials Safety Administration | 1 | $161k |
What they win
Awards
Showing 26–50 of 89 awards we hold
- Quantification And Evaluation Of Rail Flaw Inspection Practices And Modern Rail Steel Defect Growth Analysis This Task Order Shall Be Performed On A Cost-Plus-Fixed-Fee (Cpff) Basis In Accordance With The Attached Statement Of Work, Dated 05/06/20 ↗Federal Railroad Administration£360kawarded 22 Sept 2020
- The Contractor Will Document Freight Car Truck Warp Restraint Performance Requirements, Load Environment, Failure Modes, And Other Truck Operational Deficiencies (This Would Include Issues Such As Excessive Weight, Interference With Other Components ↗Federal Railroad Administration£216kawarded 11 Sept 2020
- Organize Seminar For Industry And Research Committee To Move The Science Forward For Cwr Force Management In A Coordinated Fashion ↗Federal Railroad Administration£412kawarded 11 Sept 2020
- New Task Order For Concept Of Operations, Requirements, And Hazard Analysis Development For A Road Remote Control Locomotive System To Support Automated Train Operation. ↗Federal Railroad Administration£960kawarded 27 Aug 2020
- New Task Order For Development And Testing Of A Sensor Platform To Support Automated Train Operation. ↗Federal Railroad Administration£770kawarded 23 Aug 2020
- Acquire Two Tank Cars And Conduct Two Full Scale Side Impact Tests. The Impact Tests Will Be Conducted In Accordance With The Appropriate Test Plan And Are Based Upon Previous Fra Side Impact Tests ↗Federal Railroad Administration£3.4mawarded 28 Jul 2020
- Evaluate New And Innovative Ideas And Technologies At Ttc And In Revenue Service To Mitigate The Adverse Effects Hal Operating Conditions. ↗Federal Railroad Administration£508kawarded 22 Jul 2020
- Support Services For Phmsa's Research, Development,&testing Facility At The Transportation Technology Center (Ttc) ↗Pipeline and Hazardous Materials Safety Administration£161kawarded 21 Jul 2020
- New Task Order For Development Of Systems Engineering Specification And Safety Analysis For A Quasi Moving Block Safety Server. ↗Federal Railroad Administration£574kawarded 8 Jul 2020
- Investigate How New And Existing Ballast And Track Data Collection Methods Can Be Optimized, With Regards To Both Collection And Analysis, To Develop Models That Forecast Ballast And Track Performance. ↗Federal Railroad Administration£310kawarded 1 Jul 2020
- Finalization Of Ptc Interoperable Lifecycle Management System To Include Migration Of Industry Change And Configuration Management Processes To Ptc Interoperable Lifecycle Management (Ilm) System. ↗Federal Railroad Administration£713kawarded 14 May 2020
- Develop Full Moving Block Requirements For Railroad Operations ↗Federal Railroad Administration£682kawarded 6 May 2020
- To Provide, Or Share With Ttci In Providing Selected Site Improvements That Help Ttc Remain A State-Of-Art Research Facility. ↗Federal Railroad Administration£39kawarded 22 Apr 2020
- Develop Automated Train Operation Segment Level Requirements And Document Technology Gaps. ↗Federal Railroad Administration£512kawarded 1 Apr 2020
- Complete Feasibility Analysis, Laboratory Test, And Evaluation Of Utilizing Locomotive-Based Non-Contact Transducers And Tuned Shunts To Detect Rail Breaks. ↗Federal Railroad Administration£635kawarded 27 Sept 2019
- Perform Automated Train Operations System Safety Analysis - Work With Railroads To Develop Aar Standard Interface Control Documentation For The Automated Train Operation Concept. Perform A Rigorous Safety Case And Hazard Analysis Of The Operational ↗Federal Railroad Administration£759kawarded 27 Sept 2019
- Onboard Broken Rail Research And Development Project - Phase-I ↗Federal Railroad Administration£1.4mawarded 26 Sept 2019
- Rolling Load Test Machine - Using The Rolling Contact Fatigue Load Simulator At The Transportation Technology Center To Study The Root Cause Of Rolling Contact Fatigue, And Study Wheel-Rail Mechanics. ↗Federal Railroad Administration£289kawarded 26 Sept 2019
- Ttci To Provide Facility Operation Support Services Which Includes Providing Utilities, Janitorial Services, Trash And O&m Services Necessary For The Safe And Efficient Operations Of The Surface Transportation Security Readiness Facility (Stsrf). ↗Transportation Security Administration£289kawarded 24 Sept 2019
- Develop And Test An Accurate, Non-Destructive, And Automated Method To Detect Broken Spike Fasteners In Wood-Tie Track. ↗Federal Railroad Administration£120kawarded 24 Sept 2019
- Train-To-Train Collision Test ↗Federal Railroad Administration£997kawarded 23 Sept 2019
- The Objective Of This Project Is To Complete A Broad Analysis Of The Impacts Of Ptc On Track Maintenance Activities, Human Factors, And Federal Regulation Compliance To Determine If There Are Gaps That Need To Be Filled To Effectively Integrate Track ↗Federal Railroad Administration£101kawarded 19 Sept 2019
- Ttc Site Improvements R&d - Transportation Technology Center R&d Site Improvements Related Activities - The Objective Of This New Task Is To Refurbish The Work Space Areas And Fire Station Bay Of The Storage Maintenance Building (Smb) To Assu ↗Federal Railroad Administration£833kawarded 13 Sept 2019
- Development Of System Concepts And Requirements For A Train Energy Management Performance (Temp) Monitoring System. Temp Monitoring Is Expected To Enhance The Performance Of Automated Train Operations As Well As Provide Improvements To Conventional M ↗Federal Railroad Administration£488kawarded 12 Sept 2019
- Develop And Concept Of Operations And Requirements And Evaluate Feasibility ↗Federal Railroad Administration£586kawarded 9 Sept 2019
Bidding against them?
Get new tenders in their space in a daily digest, scored against your own capability — plus the full notice behind each of these awards, with the documents and contacts it published.
Start 7-day free trialHow this profile is built
Awards are collected from official public procurement notices and deduplicated so one procurement counts once. Supplier names are grouped across their published spellings: case and punctuation are ignored, and “Ltd” is treated as optional because buyers routinely leave it off. Everything else that marks a different organisation is kept — an LLP, a plc, a CIC and a Teoranta are separate businesses from a Ltd of the same name, as are a parent and a named subsidiary, and none of them are merged here. Where another entry differs from this one only by legal form or a bracketed qualifier it is listed above as possibly the same organisation — a hint for the reader, never a merge: figures are per legal entity and never combined. Value is attributed only where the notice is explicit: the supplier's own itemised amount, or the whole value where they were the sole named supplier. Awards naming several suppliers without a published split are counted and marked shared, never valued, and a framework ceiling is never treated as money any one appointed supplier won. Sterling and euro are never added together. The linked source notice is authoritative.
Company pages are for organisations. If this page profiles you as an individual — a sole trader or an individual contractor — you can ask for it to be withheld: see how.